What Is Hongdefa Engineer Installation Regulations?

In Africa, Hongdefa Company is very famous in Africa and South America for manufacturing maize milling machines and wheat flour milling machines.

Let us see our factory of Hongdefa for Maize Milling Plant and Wheat Flour Milling Plant.
Hongdefa Factory
Our team for marketing and after-sales service of maize mill and wheat flour mill.
Hongdefa Team
We have a branch office in Zambia, Uganda, and Ethiopia. Our Chinese managers and engineers are there for doing super after-sales service.
Branch office for maize mill and flour mill
The maize milling machines will process the maize into super white maize meal, maize grits, and bran. The wheat flour mill machines can process wheat into all kinds of bakery flour which can make bread, cakes, biscuit and so on.

Let us show more projects for our customers.
Hongdefa project 
We know the after-sales service is very important for the complete production line.
It is Hongdefa developing value for doing the very good after-sales service.

After buying Hongdefa maize machines and wheat machine, we will send our Chinese engineers team to do the installation, testing the machines and train the local workers.

When arriving, they should do it as this rule.
1. After arriving at the installation site, familiarize yourself with the site environment and confirm the specific installation scope with the customer.

2. Take the marker mark and sort all the goods (including pipes, screws, clips, blue plates, platform brackets, etc.) and check with the checklist to see where they are used. If you can't confirm it, you can take it out and classify it. Before starting this work, it is forbidden to start the installation and use it indiscriminately. If you find that things are not complete, report to the company for the first time. If you do not report, the company defaults to complete things, and later installations are found to be missing. The engineers are trying to solve the problem, and the company is not responsible.

3. Good communication with the customer, the small parts as well as tools like all the bits and pieces on the device, the other out classification, a safe place, to prevent loss.

Overall planning. The exact location of the foundation needs to be done in accordance with all the disposable drawing out identification white lime or nylon line standard, the foundation made uniform. Prohibit done dry cement and other items to do next, this will seriously lengthen the progress of the project.

4. Organization of work open, duty engineer is reasonable arrangements for command of local workers to start work, ban buried themselves reckless, regardless of whether local workers. The cleaning part and the powder path part should be started at the same time. First, the equipment main unit should be properly placed according to the drawings.

5. The pipeline should be installed according to the wind network drawings, and no special changes should be made without special circumstances.

6. After installation, a continuous idle time over 20 hours, check the motor rotation is correct, whether the hotline and the motor, any abnormal sound equipment and the like before feeding test confirm normal.

We have strict rules for the engineer's installation. That is why more customers buy the machines in the second or third time.

We want to establish a good business relationship with you, pls contact us without hesitate.